Chronological evidence record
Every state change carries its basis forward.
This representative case shows how a requirement revision changes affected work, evidence obligations, blockers, package eligibility, and the eventual authority decision.
Controlling requirement established
Specification section, drawing revision, package boundary, acceptance criteria, and accountable discipline are connected.
Superseding drawing received
The new revision changes the pressure boundary and adds a testable connection previously outside package scope.
Three downstream states become unsupported
Material identity, weld examination, and hydro-boundary evidence are recalculated against the new controlling scope.
Evidence and field configuration reconciled
Updated drawing relationship, installed component identity, weld record, and required examination are connected for review.