Physical weld
Canonical identity across every project-native reference.
Physical identity and examination
KanGate resolves the same physical weld across drawings, weld logs, welder identity, WPS, NDE reports, repair records, materials, package scope, and final acceptance. Contractor teams see the exact action required to close the weld; enterprise clients see whether acceptance and downstream release are genuinely supportable.
Repair examination accepted; package consequence recalculating.
Discipline-specific evidence model
The page follows one physical weld through procedure, welder eligibility, original rejection, repair authorization, repair examination, and the packages that depend on its acceptance.
Canonical identity across every project-native reference.
WPS, revision, applicability, process, range, project control.
Qualification, continuity, process, position, date, authorization.
Required method, extent, report, indication, result, acceptance.
Reject, disposition, excavation, repair, re-examination.
Current consequence for release, turnover, and authority review.
Demonstrated operating logic
Contractor teams see the closeout action. Enterprise reviewers see whether the acceptance basis and downstream package consequence can be trusted.
Identity
Drawing mark, weld log number, NDE reference, repair reference, spool, line, and package all resolve to the same physical weld without overwriting source identifiers.
State transition
That is the point. KanGate does not flatten the weld into passed or failed. It keeps the chronology intact so a reviewer can understand what happened, who accepted it, and which packages changed.
Human authority retained
KanGate can test whether evidence supports the configured acceptance state and whether the required relationships are complete. It does not replace the CWI, NDE Level III, engineering authority, owner representative, QA/QC manager, or designated release authority.
Controlled outputs
Each register or report carries the source record, current state, open condition, accountable authority, and package consequence behind the conclusion.
A current, source-linked history for each physical weld.
Required examination, actual results, repairs, and final acceptance.
Every package, output, or release state affected by the weld event.
90-day governed proof engagement
Begin with one active project, one primary workflow or release gate, an agreed evidence set, defined authorities, bounded acceptance criteria, and a Deploy / Refine / Stop conclusion. Pricing is established after pilot-fit review and scope confirmation.