Physical weld
Canonical identity across every project-native reference.
Physical identity and examination
KanGate resolves the same physical weld across drawings, weld logs, welder identity, WPS, NDE reports, repair records, materials, package scope, and final acceptance.
Repair examination accepted; package consequence recalculating.
Discipline-specific evidence model
KanGate accepts ordinary project evidence, resolves the real-world identities behind its claims, validates the required relationships, and keeps unsupported state visible.
Canonical identity across every project-native reference.
WPS, revision, applicability, process, range, project control.
Qualification, continuity, process, position, date, authorization.
Required method, extent, report, indication, result, acceptance.
Reject, disposition, excavation, repair, re-examination.
Current consequence for release, turnover, and authority review.
Demonstrated operating logic
This representative worked example shows deterministic behavior, not a customer deployment or fabricated performance claim.
Identity
Drawing mark, weld log number, NDE reference, repair reference, spool, line, and package all resolve to the same physical weld without overwriting source identifiers.
State transition
Evidence does not become readiness on receipt. Identity, relationship, validation, authority, and downstream consequence remain separate governed states.
Human authority retained
KanGate can test whether evidence supports the configured acceptance state and whether the required relationships are complete. It does not replace the CWI, NDE Level III, engineering authority, owner representative, QA/QC manager, or designated release authority.
Controlled outputs
Outputs preserve source provenance, current state, open conditions, authority boundaries, and the exact evidence path supporting the conclusion.
A current, source-linked history for each physical weld.
Required examination, actual results, repairs, and final acceptance.
Every package, output, or release state affected by the weld event.
90-day governed proof engagement
Begin with one active project, one primary workflow or release gate, an agreed evidence set, defined authorities, bounded acceptance criteria, and a Deploy / Refine / Stop conclusion. Pricing is established after pilot-fit review and scope confirmation.