Boundary definition
Controlled drawings, test limits, included and excluded scope.
Package release control
KanGate connects the exact hydro boundary to the construction, quality, material, mechanical, exception, and authority evidence that determines whether the package is eligible for review.
Four controlling conditions remain unresolved.
Discipline-specific evidence model
KanGate accepts ordinary project evidence, resolves the real-world identities behind its claims, validates the required relationships, and keeps unsupported state visible.
Controlled drawings, test limits, included and excluded scope.
Weld completion, NDE obligations, repairs, final acceptance.
Heat, MTR, component, cut piece, installed location.
Joint configuration, torque, tools, calibration, reinstatement.
Punch, deviations, temporary conditions, unresolved conflicts.
Accountable review, conditions, release or hold decision.
Demonstrated operating logic
This representative worked example shows deterministic behavior, not a customer deployment or fabricated performance claim.
Boundary
The package connects controlled drawings, line segments, blinds, vents, drains, temporary items, exclusions, and the revision that defines the pressure boundary.
State transition
Evidence does not become readiness on receipt. Identity, relationship, validation, authority, and downstream consequence remain separate governed states.
Human authority retained
The platform distinguishes received, extracted, verified, accepted, blocked, eligible, ready for authority review, and formally released. A blue state represents governed eligibility only where the configured rules are satisfied; designated authority remains accountable for formal release.
Controlled outputs
Outputs preserve source provenance, current state, open conditions, authority boundaries, and the exact evidence path supporting the conclusion.
Current state, governing conditions, open blockers, and release basis.
Each unresolved condition tied to owner, evidence, scope, and consequence.
The source path behind every cleared or blocked package condition.
90-day governed proof engagement
Begin with one active project, one primary workflow or release gate, an agreed evidence set, defined authorities, bounded acceptance criteria, and a Deploy / Refine / Stop conclusion. Pricing is established after pilot-fit review and scope confirmation.