Skip to content

Ninety days. One project. A clear decision.

Put the project’s certainty under pressure.

Test KanGate on one active project and one workflow that matters. In 90 days, your team will see what holds work up, what resolves it, and whether the results justify a wider deployment.

DURATION90 days
BOUNDARYOne primary workflow
PRICINGEstablished after pilot-fit review

For contractors testing day-to-day delivery and owners, EPCs, operators, or enterprise teams evaluating oversight. Start with one organization; agree the scope, participants, outputs, and price before kickoff.

90-DAY PILOTMISSION 90
CURRENT OBJECTIVEDoes KanGate earn its place?Real records. Visible findings.
DAYS 1–10Scope agreed
DAY 30Workflow configured
DAY 60Evidence under test
DAY 90Deploy / Refine / Stop

The working plan

Five phases. A decision at each step.

Select a phase to see the work and its outputs. Your team provides project records and qualified reviewers; KanGate configures the workflow and tests it against the agreed criteria.

PHASE 01 · DEFINE

Agree the scope before configuration.

Choose the project, workflow, reviewers, and records. Agree what success will look like and record the starting condition.

  • Pilot Workflow Charter
  • Project and package boundary
  • Authority Matrix
  • Baseline and acceptance criteria
BOUNDARY CONTROLMISSION / 01
CONTROL QUESTIONWhat will this pilot prove?
ProjectWorkflowReviewersEvidenceOutputsCriteria

Representative worked example

Six open conditions. What changes when one closes?

Step through a sample hydro package. Each accepted record resolves a specific condition. Contractors see the closure path; enterprise reviewers can inspect why the package is eligible for review.

Illustrative sequence, not a customer result. Acceptances are simulated; these controls do not approve work.

HYDRO-PKG-022REPRESENTATIVE MODEL
PACKAGE STATEBLOCKED6 OPEN RELEASE BLOCKERS
Repair NDEMISSING
NDE identity mappingUNRESOLVED
MTR linkageMISSING
Calibration evidenceUNACCEPTED
Final redlineABSENT
Qualification reviewPENDING

Select “Next accepted record” to inspect the first change.

Verified evidenceVerified eligibilityHuman authorization still required

Six blockers remain open.

Operating discipline

What each team brings to the pilot.

Before kickoff, name the people supplying records, resolving questions, and reviewing findings. Formal approvals stay with the designated project authorities.

01

KanGate

Configures and tests the selected workflow, supports the working group, produces the agreed outputs, and reports the findings.

  • Workflow and evidence model
  • Identity and relationship configuration
  • Blocker and readiness logic
  • Support, outputs, and reporting
02

Your organization

Supplies project records, current requirements, and qualified reviewers, whether the pilot is led by a contractor or an enterprise team.

  • Evidence and authoritative sources
  • Technical and contractual requirements
  • Timely answers and dispositions
  • Formal acceptance or rejection
03

Together

Agree the working boundary, review cadence, success criteria, exception handling, and final acceptance.

  • Boundary and success criteria
  • Authority checkpoints
  • Exception handling
  • Deploy / Refine / Stop decision

Day-90 delivery framework

Six controlled packages. Sixteen defined components.

06 delivery packages16 defined components

These six packages belong to one pilot. The agreement names the evidence classes, output formats, and acceptance criteria. Open a package to inspect its components.

PACKAGE 01 · 2 COMPONENTSPilot Definition PackageAgrees the scope and decision rights.
  1. 01
    Pilot Workflow CharterRecords the workflow, scope, evidence classes, assumptions, exclusions, objectives, and acceptance criteria.
  2. 02
    Authority MatrixNames reviewers, decision rights, and release authorities.
PACKAGE 02 · 4 COMPONENTSConfigured KanGate ModelSets up the selected workflow.
  1. 03
    Configured Evidence ModelDefines required evidence and the conditions for each status.
  2. 04
    Canonical Identity ModelMatches records to the project objects in scope.
  3. 05
    Relationship ModelLinks evidence, requirements, project objects, and release decisions.
  4. 06
    Configured Evidence IntakeHandles the evidence classes named in the agreement.
PACKAGE 03 · 3 COMPONENTSValidation and Control OperationChecks records and exposes open conditions.
  1. 07
    Preflight and Validation ResultsRecords the checks applied and their results.
  2. 08
    Blocker LedgerLists missing, conflicting, rejected, deferred, and unresolved conditions.
  3. 09
    Verified-State and Readiness ViewShows current status, open conditions, and release eligibility.
PACKAGE 04 · 3 COMPONENTSProof and Output PackageConnects source evidence to agreed outputs.
  1. 10
    Evidence Lineage and Proof ManifestTraces findings to their sources and produces the agreed manifest.
  2. 11
    Agreed Generated Register or Register SetProduces the register or bounded register set named in the agreement.
  3. 12
    Representative Controlled DeliverableProduces the agreed pilot output defined before configuration.
PACKAGE 05 · 2 COMPONENTSMeasurement PackageCompares the starting and finishing conditions.
  1. 13
    Baseline AssessmentRecords the workflow and evidence condition at the start.
  2. 14
    Closeout AssessmentRecords the same workflow at closeout.
PACKAGE 06 · 2 COMPONENTSFinal Pilot Decision PackageRecords the findings and next-step recommendation.
  1. 15
    Final Outcome ReportReports scope, configuration, operation, findings, limitations, and results.
  2. 16
    Deploy / Refine / Stop RecommendationExplains the recommendation and its evidence.

How success is evaluated

Measure what changes. Keep the gaps visible.

Compare the same workflow at the start and finish. Missing records, conflicting evidence, and unsupported status claims are findings to examine—not reasons to hide the result.

REPRESENTATIVE ACCEPTANCE CRITERIACONTROLLED REVIEW
  • Agreed records received and intake demonstrated
  • Sample records checked against the agreed rules
  • Records matched to the correct project objects
  • Evidence linked to the work it supports
  • Missing or conflicting evidence shown as blockers
  • Status recalculated under the configured rules
  • At least one blocker closed by accepted evidence
  • Source records and review responsibilities traceable
  • Agreed components demonstrated or delivered
  • Baseline compared with closeout; recommendation delivered

Scope boundaries

A defined commitment. Clear limits.

Included in the controlled pilot

One project. One selected workflow.

One participating organization—contractor, owner, EPC, operator, or enterprise program—one active project, one primary workflow or release gate, and an agreed evidence set and user group. The six packages cover configuration, testing, outputs, assessment, and the final recommendation.

The signed pilot agreement governs scope, commercial terms, formats, evidence classes, acceptance criteria, and deliverable acceptance.

Not included unless separately agreed

Production-scale expansion.

Organization-wide rollout, unlimited projects or integrations, open-ended customization or reporting, wholesale historical cleanup or turnover, professional approvals or certifications, 24/7 support, and deployment beyond the pilot environment.

Commercial structure

Scope first. Commercial terms second.

PILOT PRICINGEstablished after pilot-fit review.Scope and price agreed before kickoff.

Price depends on the records to process, rules to configure, connections to establish, and support and outputs required. The fit review establishes those needs before a proposal is issued.

Autodesk Authorized DeveloperAutodesk AECO Technology Partner Program member
01Operating boundary

Project, workflow, users, and control question

The selected project, participating users, workflow, and decision the pilot must support.

02Evidence profile

Classes, volume, formats, and condition

The types, volume, formats, and condition of project records determine intake and checking effort.

03Control complexity

Rules, identities, relationships, and authority

The checks, record matching, relationships, and review responsibilities needed for this workflow.

04Delivery effort

Connections, support, registers, and outputs

Agreed connections, review cadence, user support, registers, and final output formats.

01Pilot-fit review02Scope confirmation03Proposal / SOW04Agreement05Kickoff

After Day 90

The pilot ends with a decision, not an automatic expansion.

Review the findings and limitations together. Any wider deployment needs its own agreed scope and commercial terms.

01

Deploy

Sufficient value was demonstrated and the operating conditions support controlled expansion.

02

Refine

The concept was supported, but configuration, integration, cleanup, or process changes are needed first.

03

Stop

The current use case or operating conditions do not support worthwhile deployment.

Choose a consequential boundary

Bring a workflow you need to trust.

Tell us which project, what is held up, and who needs to rely on the result. We will establish whether a bounded pilot is a useful next step.

Start the pilot-fit review
KanGateA Williams Dominion Vanguard Company

Proof-based release control for construction readiness.

© 2026 KanGate. A Williams Dominion Vanguard Company.Minimum compliance is the floor. Proof earns release. Deviations stay visible.