Turnover readiness
The facility is real. The final record must be equally real.
KanGate keeps turnover deliverables alive as verified construction state changes—so the final handoff is generated from connected evidence rather than reconstructed after the work.
SystemCS-04 Compression
Current package stateAuthority review pending
Open controlled conditions3 visible
Manifest stateRecalculated
Completion records
REVIEWCurrent construction state becomes the turnover record.
01
Mechanical completion registerCurrent system and subsystem completion state.
Updated from accepted evidenceCurrent02
Punch and exception ledgerOpen, accepted, deferred, and closed conditions.
One governing blockerReview03
Reinstatement proofCurrent physical configuration after test or rework.
Evidence pendingHold04
Authority recordAccountable review and release chronology.
Designated reviewer identifiedPendingDeterministic turnover path
A final deliverable should inherit current proof—not stale assumptions.
One accepted or rejected evidence event recalculates every affected register, manifest, certificate set, drawing package, and release chronology.
01Evidence changes
02State recalculates
03Blockers update
04Manifest regenerates
05Authority reviews
Living closeout
Stop rebuilding turnover from disconnected folders and late-stage memory.
Begin with one system, one package boundary, and one set of consequential controlled deliverables.
.png)